Slip an angle plate over the dowels at the "T" joint.
Drive ground spike through the end hole.
Walls
over 2 layers high should be braced every 1.5m where there
is earth on
one side only.
Don't
forget this dowel to lock the layer below
Add a BlocX5 and another angle plate to the next layer
For added security put a cross piece
on the top of the bottom brace.
Continue using plates and short ![]()
blocks
until 2 ![]()
![]()
rows
from ![]()
![]()
![]()
the
top.
The weight of earth on here will prevent the wall tilting.




